| Air path | Moves air inside the space | Moves air out through a defined boundary | Where does the air go, and where does replacement air enter? |
|---|
| Performance basis | Proposed air movement over the intended occupied zone | Required flow at the selected system pressure and conditions | Does the supporting evidence describe this actual layout or duty? |
|---|
| Obstructions | Racks, partitions, lights and other services can affect the arrangement | Shutters, guards, ducts and inlet restrictions affect resistance | Which obstacles and accessories were included in the selection? |
|---|
| Building air changes | Circulation rating is not outdoor-air replacement | Actual exchange flow can be related to a defined room volume | Is the quoted flow a real boundary-crossing exchange flow? |
|---|
| Installation scope | Structure, mounting, clearances and matched controls | Opening, support, inlet/discharge details and controls | Who owns the interfaces and the site work? |
|---|
| Acceptance | Agreed occupied-zone conditions and operating modes | Agreed operating airflow/pressure and replacement-air conditions | What will be measured, where and with which method? |
|---|
| Purchase comparison | Compare layouts and complete circulation scope | Compare the same exhaust duty and complete air-path scope | Are the two offers even solving the same problem? |